Dyson

Office building in Tuas

Applications Used

Lighting

Heating, Ventilation & Air conditioning (HVAC)

Security and Safety

Operation and Visualisation

Energy Management/Smart Metering

Other

Automation and Remote Access

Blind and Shutter Control

Project Details

Category Value
Project Category Office building
Project Type Commercial
Year of Completion 2024
Project Size 5.000+
Number of KNX Devices Used 501 – 1.000
KNX Transmission Media Twisted pair
Man Hours 501 – 1.000
Man Power 6 – 10

Featured in this project

Schneider Electric GmbH c/o Merten
Schneider Electric Industries S.A.
Steinel Vertrieb GmbH

Detailed Description

Energy Efficiency

The usage of automated functions already save energy in every installation. Especially the usage of KNX has a lot of potential for further energy savings, which can contribute to a better environmental footprint. Be extending KNX to more functions and applications, energy savings of up to 60% can be realised. Thanks to the flexibility of KNX, these functions can easily be implemented in this installation

Innovation

Smart homes and buildings are always an upgrade in comparison to a conventional installation. Not only automated functions and a higher level of comfort contribute to a higher living standard, but also the possibility to be ready for coming innovations. Thanks to the usage of KNX, the door has been opened to integrate new innovative solutions, using the worldwide STANDARD for home and building control.

Applications Used

  • Lighting - Switching, Dimming, Light Scenes, Timed Control, Automatic Occupancy Detection, Constant Light Control
  • Heating, Ventilation & Air conditioning (HVAC) - Automatic Occupancy Detection
  • Security and Safety
  • Operation and Visualisation - Switches / Push Buttons, PC Visualisation, Web Servers, Touch Panels & Display Panels
  • Energy Management/Smart Metering - Metering, Current Detection
  • Other
  • Automation and Remote Access
  • Blind and Shutter Control - Individual Control

Customers Description

Dyson has a significant presence in Singapore, including its global headquarters and a new, state-of-the-art battery manufacturing plant. The battery plant, located in Tuas. The Project building consist of Open office ,Meeting rooms, Factory unit and Roof, Landscape. KNX control has been selected as control system for areas considered as front of the house and façade system. Controls like DALI gateway, Relay actuators, control modules, Scheduling, Master Control and Interface with AV System. Schneider 8 Button Keypad installed in this project for all meeting room. Smart IAQ Sensor installed for all rest rooms and Toilets. All Lighting points are monitor by Building Management System.

Contact Information

Company Name Automated Lab Asia
Company Email prabhu@automatedlab.asia
Company Website https://www.automatedlab.asia/
Contact Name Prabhu
Contact Function System Integrator