Aeropuerto El Dorado

Airport in Bogota

Applications utilisées

Lighting

Heating, Ventilation & Air conditioning (HVAC)

Security and Safety

Operation and Visualisation

Energy Management/Smart Metering

Other

Automation and Remote Access

Blind and Shutter Control

Détails du projet

Catégorie Valeur
Catégorie de projet Airport
Type de projet Commercial
Année d'achèvement 2013
Taille du projet 5.000+
Nombre d'appareils KNX utilisés 1.000+
Supports de transmission KNX Twisted pair
Heures-hommes 2.000+
Main-d'œuvre 100+

Mis en vedette dans ce projet

Albrecht Jung GmbH & Co. KG
Siemens AG
Schneider Electric Danmark A/S
Esylux GmbH & Co. KG
DEHN SE
Wieland Electric GmbH

Description détaillée

Energy Efficiency

The usage of automated functions already save energy in every installation. Especially the usage of KNX has a lot of potential for further energy savings, which can contribute to a better environmental footprint. Be extending KNX to more functions and applications, energy savings of up to 60% can be realised. Thanks to the flexibility of KNX, these functions can easily be implemented in this installation

Innovation

Smart homes and buildings are always an upgrade in comparison to a conventional installation. Not only automated functions and a higher level of comfort contribute to a higher living standard, but also the possibility to be ready for coming innovations. Thanks to the usage of KNX, the door has been opened to integrate new innovative solutions, using the worldwide STANDARD for home and building control.

Applications utilisées

  • Lighting - Automatic Occupancy Detection
  • Heating, Ventilation & Air conditioning (HVAC)
  • Security and Safety
  • Operation and Visualisation
  • Energy Management/Smart Metering
  • Other
  • Automation and Remote Access
  • Blind and Shutter Control

Description des clients

This is the brand new National and International Passengers Terminal of El Dorado airport, main airport in Bogota. The airport was built by concession of the Colombian State by the company OPAIN, who in turn subcontracted the design, installation and commissioning of the entire lighting automation of the building (180.000 m2), the air-side platform planes arrival (580.000 m2) and the land-side parking and access areas (280.000 m2). All luminaries were controlled by DALI with KNX control

Coordonnées

Nom de l'entreprise NEGOCIOS Y PROYECTOS / CINERGIA IE
E-mail de l'entreprise nyp.jorgegutierrez@gmail.com
Company Website http://www.cinergia.com.co
Nom du contact Jorge Gutiérrez P.
Fonction de contact System Integrator