Aeropuerto El Dorado

Airport in Bogota

Applications Used

Lighting

Heating, Ventilation & Air conditioning (HVAC)

Security and Safety

Operation and Visualisation

Energy Management/Smart Metering

Other

Automation and Remote Access

Blind and Shutter Control

Project Details

Category Value
Project Category Airport
Project Type Commercial
Year of Completion 2013
Project Size 5.000+
Number of KNX Devices Used 1.000+
KNX Transmission Media Twisted pair
Man Hours 2.000+
Man Power 100+

Featured in this project

Albrecht Jung GmbH & Co. KG
Siemens AG
Schneider Electric Danmark A/S
Esylux GmbH & Co. KG
DEHN SE
Wieland Electric GmbH

Detailed Description

Energy Efficiency

The usage of automated functions already save energy in every installation. Especially the usage of KNX has a lot of potential for further energy savings, which can contribute to a better environmental footprint. Be extending KNX to more functions and applications, energy savings of up to 60% can be realised. Thanks to the flexibility of KNX, these functions can easily be implemented in this installation

Innovation

Smart homes and buildings are always an upgrade in comparison to a conventional installation. Not only automated functions and a higher level of comfort contribute to a higher living standard, but also the possibility to be ready for coming innovations. Thanks to the usage of KNX, the door has been opened to integrate new innovative solutions, using the worldwide STANDARD for home and building control.

Applications Used

  • Lighting - Automatic Occupancy Detection
  • Heating, Ventilation & Air conditioning (HVAC)
  • Security and Safety
  • Operation and Visualisation
  • Energy Management/Smart Metering
  • Other
  • Automation and Remote Access
  • Blind and Shutter Control

Customers Description

This is the brand new National and International Passengers Terminal of El Dorado airport, main airport in Bogota. The airport was built by concession of the Colombian State by the company OPAIN, who in turn subcontracted the design, installation and commissioning of the entire lighting automation of the building (180.000 m2), the air-side platform planes arrival (580.000 m2) and the land-side parking and access areas (280.000 m2). All luminaries were controlled by DALI with KNX control

Contact Information

Company Name NEGOCIOS Y PROYECTOS / CINERGIA IE
Company Email nyp.jorgegutierrez@gmail.com
Company Website http://www.cinergia.com.co
Contact Name Jorge Gutiérrez P.
Contact Function System Integrator