Technology Tutorial Workshop 2004 : results
Conference was hosted by Fachhochschule Deggendorf
|
10.00 - 10.20 |
TP1 System Components – BIM, chip set, BCUs, TP-UART – technical features |
13.15 - 13.35 |
Making an ETS product database |
|
10.20 – 10.40 |
Powerline 110 System Components – PIM |
13.35-13.55 |
Use of LTE extension to the KNX stack for HVAC applications |
|
10.40 –11.00 |
Powerline 132 chip set – technical features |
13.55 - 14.15 |
How to develop an A-mode compatible KNX device |
11.00 |
Coffee break |
14.15 - 14.35 |
What to bear in mind when making a product compliant with KNX Easy |
|
11.15-11.35 |
Physical layer implications on Radio Frequency |
14.35 |
Coffee break |
|
11:35 -11:55 |
Loadable Applications for Non-Motorola based KNX-Devices |
14.50 - 15.10 |
State of affairs – KNX interworking model and standardised data types/functional blocks - Mr. S. De Bruyne - System Engineer |
|
11.55 –12.15 |
Finding your way around the KNX Specifications |
15.10 - 15.30 |
Certification of KNX devices - Procedure and test requirements |
12.15 |
Lunch break |
15.30 -15.50 |
What Falcon does for you - Development of software packages (e.g. visualisation) on the basis of Falcon - Mr. C. Sahm - ISE GmbH |
Download list of attendants here.photo impressions of conference can be downloaded here
KNX Association would wish to thank all confererence speakers as well as FH Deggendorf as host of the event.
For more information feel free to contact us: info(at)konnex.org
